Value engineering belongs before construction, not after it

ISPC · Published: 21 Oct 2026 — 12:22

Substructure decisions taken in design carry the largest recoverable value in a mixed-use development.

By the time a site is mobilized, most of the cost is already committed. Testing buildability, quantities, excavation strategy and circulation inside the model — before tender — is where a development protects its margin.

On our Ain El Basha development, a continuous loop ramp and cascading 3D benching indicated potential savings of up to US$500,000 and a potential 35–45% reduction in substructure concrete and steel, subject to final design and authority validation.